25-May-2005
Chris,
Nothing yet from Sybiz, so let’s rollback to SR3 (I said SR5 in my
previous message, but it was actually SR3 we were on before)
To roll back to SR 3, perform the following steps.
1. On the local server, delete the contents of the Patches folder.
2. run the SR3 patch.
3. On each workstation, delete the local Vision folder, and re-run
Visilan to re-install. On first starting, each workstation will update the
exe’s from the 2.6GR to 2.5SR3, once they are done, you will be finished.
4. After visilaning the first workstation, log into sybiz \, go to
reindex and tick “structure check”
Related Articles
No user responded in this post
Leave A Reply